Temperature control and sterilising
In the fast-evolving world of laboratory and industrial heating applications, precise control and ease of use are paramount. Carbolite’s new AriesPlus touch screen temperature controllers set a new benchmark for performance, reliability, and user experience. Built with advanced technology and intuitive design, AriesPlus delivers the ultimate in easy, precise, and intelligent temperature control.
At the heart of AriesPlus lies its powerful programmable control capabilities. Each controller allows users to set up to 99 segments per program, which can be configured as ramp, step, or dwell, and can also control relay operations. With the ability to store and retrieve up to 50 unique program profiles, AriesPlus enables seamless management of complex processes and repeatable protocols.
Featuring a vibrant 7.0’’ colour capacitive touch screen, the AriesPlus series gives users intuitive access to a comprehensive menu for program selection, editing, and scheduling. Programs can be scheduled to start at a specific day and time, and all settings are easily accessible, including localization in nine different languages. The live process graph display provides real-time feedback, enhancing process transparency and decision-making.
AriesPlus is equipped with robust data-logging features. Temperature setpoints and actual values are securely stored in internal memory, with the option to download data via a convenient front-panel USB port or across a network using the standard Ethernet connection. Remote monitoring is effortless; simply connect via any browser, with no software installation required.
User level security ensures controlled access, while optional integrated over-temperature protection offers clear alarm indication, essential for unattended operation and safeguarding valuable loads. Additional alarm activation options can trigger functions such as door locking or process accuracy monitoring. Program segment events also allow for automation of external devices, such as gas flow switches or cooling fans.
AriesPlus integrates advanced THERMOTUNE for exceptional precision and temperature stability, as demonstrated in performance comparisons with leading competitors. Its high-quality PID control ensures accurate adherence to ramp rates and setpoint temperatures, making it a top choice for laboratories and industrial environments alike.
With its comprehensive features, advanced control capabilities, and user-friendly interface, AriesPlus redefines what you can expect from a temperature controller.
Discover the difference AriesPlus can make for your laboratory or industrial heating applications where easy operation, precision, and control are always at your fingertips - request a personalized demo with one of our experts here.